Element construction are building a number of apartment blocks in Huddersfield on a site that was approximately 5m below the main highway. The access to the site was from a ramp from the main road to the site. The contractor had build a temporary access road using site materials and sandbags. A permanent structure was required for access.

The Challenge

The engineers were Gravitate Consulting. The first ramp design used steel that transferred the loads into ground beams and piles. The project went over budget and the engineers were asked to see if they could come us with an alternative solution. BlockWalls were asked for some ideas.

The Solution

The solution was a mix of reinforced concrete interlocking blocks and a reinforced earth ramp. BlockWalls developed an outline idea. Gravitate then developed the idea and designed the solution up. The project was then re-estimated and came within budget. BlockWall prepared a delivery program, manufactured the blocks and delivered them to the construction sequence. The ramp was built to the timeline and was a great success.

To discuss your plans, ideas and future projects, or receive a quote, please get in touch today.

Get In Touch


Your privacy (see our Privacy Policy for full details)

Virtus Concrete Solutions Limited will process the personal data you provide together with any other information we receive from or about you for administration, market research, profiling, and relationship building on the basis of our legitimate interests to do so to . We may retain it for 10 Years on secure servers in in the UK using a trusted service provider.

With your consent, we will send you information you request by the communication methods you have chosen.


You have the right to access your personal data and, in some cases, to require us to restrict, erase or rectify it or to object to our processing it and the right of data portability.

Concerns or complaints can be made to info@blockwalls.co.uk or the Information Commissioner’s Office.